About Us

Who We Are ?

GMR as a new generation state of the art unit with integrated facilities for Design, Manufacture, Logistics and various types of Project Execution Capabilities for Pre-engineered steel buildings in India.

with over years of experience in managing various similar providers in the region, the company's philosophy revolves around facilitating latest technologies to facilitate economical structural designs for their customers Accordingly.

This forms the basis of our business augmentation strategy. We have the most advance metal systems, manufactured under close quality control on automated assembly lines to ensure international quality PEB systems.

Our in-house trained and experienced team ensures that it complements the systems available with us, in providing quality structures, services and support to our valued customers, A significant source of strength to our company has been strong pre and post sales relationship with our clients.

  PEB Building CONVENTIONAL STEEL BUILDINGS
Foundations Simple Design, easy to construct and light Weight Extensive,  heavy foundation required
ERECTION COST AND TIME Both costs and time of erection are accurately known based upon extensive experience with similar buildings. The erection  process is faster and much easier with very less equipment. Typically,  conventional steel buildings are 30{023ac6f04b508b2c175ee99c0269b75fdec0d7c42f2c1b1f558432630a666901}  more expensive than PEB in most of the cases,  the erection costs and time are not estimated accurately.  Erection process is slow and extensive field labour is required Heavy equipment is also needed.
SEISMIC RESISTANCE The low weight flexible frames offer higher resistance to seismic forces. Rigid heavy frames do not perform well in seismic zones.
ARCHITECTURE outstanding architectural design can be achieved at low cost using standard architectural details and interfaces. Special architectural design and features must be developed each project which often require research and thus resulting in higher cost.
SOURCING AND COORDINATION Building is supplied complete with all accessories including erection for a single"ONESTOP SOURCE" Many sources of supply are there so it becomes difficult to co ordinate and handle the things.
FUTURE EXPANSIONS All project records are safely and orderly kept in electronic format which make sit easy for the owner to obtain a copy of his building recordat anytime.  Future expansion is very easy and simple. I t would be difficult to obtain project records after a long period of time.  It is required to contact more than one number of parties.  Future expansion is most tedious and more costly.
SAFETY AND RESPONSIBILITY   Single source of responsibility is there because all the job is being done by one supplier. Multiple responsibilities can result in question of who is responsible when the components do not fit in properly,  insufficient material is supplied or parts fail to perform particularly at the supplier/contractorinterface
PERFORMANCE   All components have been specified and designed specially to act together as a system for maximum efficiency,  precise fir and peak performance in the field.  Experience with similar buildings,  in actual field conditions world wide,  has resulted in design improvements over time,  which allowdependable prediction of performance.      Components are custom designed for a specificapplication on a specific job.  Design and detailing errors are possible when assembling the diverse componentsinto unique buildings.  Each building design is unique,  so predication,  of how components will perform together is uncertain.  Materials which have performed well in some climates may not do in other conditions.